BACKGROUND In 2013, Water Resources staff identified a previously unknown Combined Sewer Overflow (CSO) point in the form of an overflow pipe in a combined sewer manhole that was connected to an adjacent separate stormwater pipe that discharges at the BED outfall (see map) which discharges to the Pine Barge Canal and eventually to Lake Champlain. All addendums and answers to any questions received by the above time and date, will be ed to the qualified WRTAP consultants who received the RFP by Monday, August 31st at 4 pm. PROPOSED PROJECT SCHEDULE Friday, AugFriday, August 28 th, by noon Monday August 31 st, by 4 pm Wednesday, September 16 th, by 2 pm Late September 2015 DecemRFP released to qualified WRTAP consultants Deadline for submission of questions Response to questions ed RFP submission deadline Project kick off Tentative project completion deadline All questions pertaining to the RFP should be submitted to Megan Moir, Stormwater Program Manager, by by noon on Friday, August 28th.
![pcswmm rtk pcswmm rtk](http://4.bp.blogspot.com/-D9DPjoG1754/UgOC441D3nI/AAAAAAAAD_I/3zGyVf8wXGE/s1600/image003-726241.png)
The proposals will also be evaluated on the basis of whether or not the consultant may be able to provide assistance in additional phases (Phase II and Phase III). This RFP details the Phase I Alternatives Analysis and Preliminary Engineering work to be assigned under a WRTAP Work Assignment Agreement. We anticipate 3 likely phases: Phase I (Alternatives Analysis and Preliminary Engineering), Phase II (Final Design) and Phase III (Construction Oversight). 1 Request for Proposals (RFP) Water Resources Technical Assistance Program Pine Street CSO Abatement Phase I: Alternatives Evaluation and Preliminary Engineering SUMMARY The City of Burlington (City) is issuing this Request for Proposals (RFP) for assistance from qualified Water Resource Technical Assistance Program (WRTAP) consultants to assist in examining alternatives and completing preliminary engineering for reduction of stormwater runoff to the combined sewer area above the Pine Street CSO.